On the southwest side of the pool the gunite pool shell is exposed, giving us a glimpse to any issues that may be present / water loss and on that southwest side of the pool we see a minor water bleed / blemish coming through in at least one location. Likely related to one of the splits / cracks forming on that wall of the pool - described in Surface section.
On the north east side of the pool there is some decking and structure movement, causing tiles to pop off near the skimmer. This area will likely need attention via tile repair ($500+) but additional issues is likely present (concrete decking / movement) therefore confirming the extent of this issue Vs. at time of tile repair / or replaster repair = will be a more accurate assessment opportunity.
We are seeing that the concrete on the north and north east side does have movement present, and if this entire north and north east side of concrete had to be redone the cost would likely be around $10k+ to demo, remove and replace, this would likely also include a new skimmer (if needed current skimmer looks recently replaced) and addressing / reinforcing the skimmer throat area (current stress cracking seen) will likely be an extra cost ($3k+?) as well as the west side ($3k+?)
Additionally, we do see the aging raised rock decorations showing signs of issues with cracks forming and mortar aging while it’s likely not needed today, it will need some attn done in the next 1 to 10 years ($3k+).
Black water stop plastic material can easily be removed - only aesthetic at this point.
|