The tile around the pool spillover has many (countless) sections of millimeter sized missing mortar and will likely need to be re-mortared as soon as possible to prevent additional water loss / seepage to occur that will compromise the integrity of the structure (recommend estimate via tile Technician for accurate cost);
A. On the north most section of the pool there is separation between what is likely the pool and the foundational wall this has been attempted to be filled in with mastic.
B. Below that repair section it is also apparent that water has been seeping through this area likely from the swimming pool itself either through the channel drain or possibly other locations.
C. The spillover channel drain on both the pool and spa it not properly gapped for efficient spill-over usage, and additionally there is a final tile likely a decoration piece put on the end preventing proper drainage to occur from the trough into the lower basin. It would be ideal to remove the end tile pieces to allow proper drainage to occur.
D. There are many sections which I counted nine on the lower basin where there is a crack and subsequent gap on the tile that runs from the wall to the top coping down into the pool wall this will likely have to be repaired specifically the tile and etc.
E. On the pool spill over I am noticing that the center of the spill over is spilling over while other sections are not, this may require modification to the install tile lip to allow even distribution of water to spillover the vanishing edge.
F. On the north section of the pool spill over on the wall face of the lower basin there are sections of cracks and subsequent calcium leaching occurring likely due to mismanaged mortar on the spillover edge.
G. Around the pool specifically on the upper deck location closest to the house in between the pool and the house the coping pieces are slightly loose and may require re-adherence using mortar.
H. The fire bowls have slight delamination occurring between the Plaster and Tile. This will likely have to be repaired with tile versus using plaster to allow proper waterproofing to occur / non discoloration / longevity between the Spillover and the bowls bases.
I. The channel drains between the pool to the foundation wall will likely need to have the single decorative tile removed so proper drainage can occur in both the pool and spa / the spa spillover tiles will likely need to be gapped larger to allow proper overflow to occur vs wetting the outside edge / deck causing a trip hazard.
J. The steps leaking into the lower basin are not code compliant and will need a hand rail for safety.
|